0406717749

Phone number

9/275 Annagrove Rd Rouse Hill

Address location

Project details

The Brookvale Residence

Hills View Homes

Overview

Introducing The Brookvale Residence — a contemporary two-story home nestled in the heart of Bella Vista. Crafted with precision and thoughtfulness, this custom-built home combines modern aesthetics with functional design, delivering an exceptional living experience tailored for families.

Project Highlights

  • Location: Bella Vista, NSW

  • Project Type: New custom-built home

  • Size: Approximately 260 sqm

  • Bedrooms / Bathrooms: 4 bedrooms, 3 bathrooms

  • Garage: Double garage with internal access

  • Design Style: Sleek modern facade paired with warm, natural interiors

Architectural & Design Features

  • High-ceiling foyer: Welcoming entry with a statement staircase and pendant lighting.

  • Open-plan downstairs: Central living and dining area that transitions seamlessly into a courtyard-style outdoor alfresco.

  • Gourmet kitchen: Equipped with Caesarstone benchtops, a walk-in pantry, and full-height cabinetry for a clean, elegant look.

  • Master suite: Located on the upper level, featuring a walk-in robe and ensuite with dual vanities and upgraded fixtures.

  • Private study nook: A versatile workspace for home office use or reading corner.

Sustainability & Efficiency

    • Passive solar design principles maximize natural light and temp control.

    • Energy-efficient LED lighting and premium insulation.

    • Water-saving taps and dual-flush toilets help reduce resource consumption.

Client details

The Richardson Family from Bella Vista wanted a modern, spacious family home. They needed flexible living areas with energy efficiency and timeless design.

service provided

Reconstruction, Re-novation, Bathroom fittings We delivered a custom home design with full project management support. Interior styling, exterior finishes, and sustainability features were included.

Project timeline

Concept design and approvals were completed within 10 weeks. Construction to final handover took around 6.5 months.